Support kami dengan share website kami ke teman-teman kalian agar website kami berkembang menyajikan batch donghua terlengkap untukmu, terima kasih.
Bagi kamu yang ingin memberikan masukan atau saran, bisa hubungi kami atau komentar di bawah.
Mohon maaf jika ada Donghua atau resolusi yang belum tersedia. Kami akan menambahkannya secara bertahap sesuai ketersediaan sumber daya. Support Me

Roc-2015 Controller Manual Pdf [ Free ]

Replace the battery when the software indicator flags a "Low Battery" warning (typically when voltage drops below 2.8 VDC).

Pre-wired connection for the Conductivity Sensor Cell. Step-by-Step Operating Logic

Temperature 0 ~ 50°C, Humidity ≤ 85% RH

The ROC800-Series controller bridges the gap between traditional Programmable Logic Controllers (PLCs) and Remote Terminal Units (RTUs). It combines the physical ruggedness of an RTU with the computational power and high-point count of a PLC. Key Technical Specifications 32-bit Motorola PowerPC. Operating Temperature: -40°C to 75°C (-40°F to 167°F). Power Input: 11 to 30 VDC. roc-2015 controller manual pdf

Connected to the product water storage tank float switch to trigger auto-shutoff when full.

The flush valve closes, and the high-pressure pump activates. Water forces through the membrane, and the display updates with live conductivity readings. 3. Full Tank Standby

LED indicators for power, water production, flushing, high/low pressure, and tank full status. Replace the battery when the software indicator flags

This comprehensive guide serves as an operational manual, technical reference, and troubleshooting resource for the ROC-2015 controller. 1. Technical Specifications and Overview

The ROC-2015 is an advanced reverse osmosis program controller often utilized to manage multi-stage filtration processes. It is designed to work with high-pressure pumps to protect membranes and ensure that pre-filters and main RO stages operate in synchronization. Key Features of the ROC-2015

Install an external, fast-acting 5-Amp fuse on the positive DC voltage leg before it enters the controller. Input and Output (I/O) Module Configuration It combines the physical ruggedness of an RTU

This is the most referenced section. It contains the detailed terminal block diagrams. You will find the exact screw terminal for the , the 24 VDC power input , and the discrete outputs . If your device isn't turning on, check the power wiring diagram on Page 4-3 (typically).

The controller will automatically flush the RO membrane for a pre-set duration (e.g., 30 seconds to 2 minutes) every time the system starts or after a set period of operation to prevent scaling. 5. Maintenance and Troubleshooting

Connect the main AC power line (Line and Neutral).

©2026 DonghuaBatch - All Rights Reserved
roc-2015 controller manual pdf Loading...